1913 - The 2nd Hotel Vancouver

Rate this item
(0 votes)

The history of the redevelopment of the second Hotel Vancouver is surprisingly complicated. The CPR opened the first hotel in 1888. In 1893 they added a new wing known as the Van Horne wing on Granville Street, and then another completed around 1904 on Georgia Street at a cost of $100,000. This was designed with the intent of setting the style of the new, much larger hotel. By 1908 Eric Nicol noted that the Hotel “had 205 rooms, 75 with bath connections – a ratio bordering on hedonism”.

In 1910 the CPR excavated on Howe Street and in early 1911 built Honeyman and Curtis’s Annex. Meanwhile, at the end of 1910 the new CPR architect W S Painter obtained a building permit for an addition to the hotel. In January 1912 it was reported that a $1,000,000 14-storey replacement hotel would be built for the CPR. It wouldn’t just fill the Granville and Georgia corner, it filled the block all the way back to Robson and Howe.

In May, 1912 under the headline, To Start work on CPR Hotel in Fall’ the Contract Record said "The latest advices from Montreal by the C P R in Vancouver state that the board of directors of the railway company have approved an appropriation of $1,200,000 for the proposed reconstruction of the Hotel Vancouver, and another $215,000 for the power plant in connection with the hotel.

The main hotel building will occupy the site of the hotel office or central section and will be extended south as far as the Opera House lane. It will be at least twelve stories in height, and two additional stories will be added to the Georgia Street wing completed about eight years ago.

When completed the hotel, it is said, will have the largest ground floor corridors of any hotel in existence. Construction will be started late this fall as soon us the rush of tourists is over. The plans are now being prepared by Painter & Swale, Metropolitan bldg."

In October the Daily Building Record reported “Plans were filed with the building inspector yesterday for the proposed rebuilding of the Hotel Vancouver, corner of Georgia and Granville Streets, at a cost of $800,000. The structure will be of steel and concrete with terra cotta facings.

The building will be heated by steam and all of the partition walls will be fireproof. Hardwood floors are specified, also 3 passenger elevators and one for freight. The central portion of the bldg will be 14 storeys in height with wings on either side, the New Orpheum theatre, which is now being erected, being in the nature of a wing to correspond with the railway company’s main hotel bldg. Painter & Swales, Metropolitan bldg. are the architects. A contractor has not been set as yet.”

By November 1912 the architects (who had moved offices) were looking for suppliers of the terra cotta and the steel contract was let to J. Coughlin at a cost of $200,000. Then everything slowed down. In 1913 reports covered a revised version of the plans “The Canadian Pacific Railway recently deposited plans for four additional storeys to the central portion of the Hotel Vancouver, Vancouver, and for the east wing fronting on Granville street, at an estimated cost of $1,100,000. The estimated outlay on the work of reconstructing the central portion of the hotel, calling for twelve storeys, was $800,000, so that with the addition of the work now proposed, the ultimate cost will not be far short of $2,000,000. According to the plans, the central part of the structure will be sixteen storeys in height, and the east wing will be eleven storeys, with the exception of the centre, midway between Georgia street and the Orpheum theatre. Here a large hall will be situated, for banquet purposes. The entrance to this hall will be 87 feet by 59 feet, and will be from Granville street. The whole structure will be of reinforced concrete and steel construction, faced with pressed brick.” Painter and Swales obtained another permit – this one for $1,100,000, and construction started. The various replacement sections, additions and the extra height were now said to be costing $2,500,000. By the time the project was being built the architect was Francis Swales; like Francis Rattenbury who was the initial choice for the new hotel, W S Painter had abandoned the task.

Even then, everything wasn’t complete. The Granville Street wing was the last to be added, replacing the Van Horne wing, and completed in 1916. The company confirmed that year they would be adding 250 more rooms but not until the war was over. The company said the hotel had already cost $3,000,000 and the addition would cost $750,000 more. That part of the project never happened. Even as it was being planned, a long term future of the project was in doubt. In the meantime, the most remarkable and expensive building that the city had seen was open for business, with fabulous views out to the north shore mountains from the sixteenth storey roof garden and terrace.

In 1928 construction begins on the Hotel British Columbia (the current Hotel Vancouver). It was not completed until 1939.

Source: Changing Vancouver